Peaches 1986 CJ7 
Installed 5/16"x18x1" grade 5 bolts
100 1966
Installed 5/16"x18x1" grade 5 bolts
100 1966

Adjust and tighten up windshield knobs
100 1965
Adjust and tighten up windshield knobs
100 1965

Temp used windshield installed
100 1964
Temp used windshield installed
100 1964

Installing rubber seal
100 1963
Installing rubber seal
100 1963

New rubber seal from Quadra Tech
100 1971
New rubber seal from Quadra Tech
100 1971

Reinstalling motor and arm
100 1962
Reinstalling motor and arm
100 1962

22+ yr old glass, I tried to save it
100 1961
22+ yr old glass, I tried to save it
100 1961

Then the glass broke
100 1960
Then the glass broke
100 1960

Cleaned rubber ribbs
100 1959
Cleaned rubber ribbs
100 1959

Glass removed, no breakage.
100 1958
Glass removed, no breakage.
100 1958

Removing glass
100 1957
Removing glass
100 1957

Windshield removed, shows dash pad
100 1956
Windshield removed, shows dash pad
100 1956

Windshield removed
100 1955
Windshield removed
100 1955

Had to cut the metal away to grind off bolts
100 1954
Had to cut the metal away to grind off bolts
100 1954

Remove screw
100 1953
Remove screw
100 1953

Remove wiper motor
100 1952
Remove wiper motor
100 1952

Arm to motor removed
100 1951
Arm to motor removed
100 1951

Remove clips for wiper arms
100 1950
Remove clips for wiper arms
100 1950

Unplug wiper motor
100 1949
Unplug wiper motor
100 1949

Windshield down
100 1948
Windshield down
100 1948

Had to drill out two bolts to remove windshield
100 1946
Had to drill out two bolts to remove windshield
100 1946

Had to drill out two bolts to remove windshield
100 1945
Had to drill out two bolts to remove windshield
100 1945

1986 CJ Windshield
100 1947
1986 CJ Windshield
100 1947

Step installed.  40 min per side w/painting.
100 1697
Step installed. 40 min per side w/painting.
100 1697

Paint step to color.
100 1696
Paint step to color.
100 1696

Sand & paint step w/galvanized primer.
100 1695
Sand & paint step w/galvanized primer.
100 1695

Step to go on the CJ.
100 1689
Step to go on the CJ.
100 1689

Drill the other pilot holes for marking.
100 1694
Drill the other pilot holes for marking.
100 1694

After hole is the correct size, mount the step to get the other holes lined up.
100 1693
After hole is the correct size, mount the step to get the other holes lined up.
100 1693

Drill center pilot hole
100 1691
Drill center pilot hole
100 1691

Part/Tools to install steps
100 1690
Part/Tools to install steps
100 1690

100 1600
100 1600

100 1599
100 1599

100 1598
100 1598

100 1597
100 1597

100 1596
100 1596

Bob welding the tire carrier
100 1587
Bob welding the tire carrier
100 1587

Bob miging the tire carrier
100 1589
Bob miging the tire carrier
100 1589

Bob gringing the weld
100 1590
Bob gringing the weld
100 1590

CJ in the shop for some welding buy Crystal River Custom Fabricators
100 1595
CJ in the shop for some welding buy Crystal River Custom Fabricators
100 1595

Powered by Gallery v1