Installed 5/16"x18x1" grade 5 bolts
100 1966
|
Adjust and tighten up windshield knobs
100 1965
|
Temp used windshield installed
100 1964
|
Installing rubber seal
100 1963
|
New rubber seal from Quadra Tech
100 1971
|
Reinstalling motor and arm
100 1962
|
22+ yr old glass, I tried to save it
100 1961
|
Then the glass broke
100 1960
|
Cleaned rubber ribbs
100 1959
|
Glass removed, no breakage.
100 1958
|
|
Windshield removed, shows dash pad
100 1956
|
Windshield removed
100 1955
|
Had to cut the metal away to grind off bolts
100 1954
|
|
Remove wiper motor
100 1952
|
Arm to motor removed
100 1951
|
Remove clips for wiper arms
100 1950
|
Unplug wiper motor
100 1949
|
|
Had to drill out two bolts to remove windshield
100 1946
|
Had to drill out two bolts to remove windshield
100 1945
|
1986 CJ Windshield
100 1947
|
Step installed. 40 min per side w/painting.
100 1697
|
Paint step to color.
100 1696
|
Sand & paint step w/galvanized primer.
100 1695
|
Step to go on the CJ.
100 1689
|
Drill the other pilot holes for marking.
100 1694
|
After hole is the correct size, mount the step to get the other holes lined up.
100 1693
|
Drill center pilot hole
100 1691
|
Part/Tools to install steps
100 1690
|
|
|
|
|
|
|
Bob welding the tire carrier
100 1587
|
Bob miging the tire carrier
100 1589
|
Bob gringing the weld
100 1590
|
CJ in the shop for some welding buy Crystal River Custom Fabricators
100 1595
|